Product Overview
Bijur Delimon Progressive Divider Valve Manifold
Bijur Delimon M2500C8G M2500G Progressive Divider Valve Manifold, Eight-Section, Steel, Zinc-Nickel Plated
Part Number / SKU: M2500C8G
The Bijur Delimon M2500C8G is a M2500G progressive lubrication divider valve manifold. It is used to distribute measured lubricant through a centralized progressive system for machinery lubrication points that require repeatable oil or grease delivery.
Specifying, quoting, or replacing M2500C8G
Purchasing
Quotes come back PO-ready with a firm lead time, and freight is already included in the listed price — no separate shipping charge appears at checkout.
Maintenance & Shop Floor
Replacing a unit already on the machine? Send the nameplate photo or the part number you are running and we will confirm section count, discharge volume per cycle, and outlet porting before you raise the PO.
Quality & Engineering
Manufacturer datasheets and operator manuals are linked on this page for MRO records and documentation packages. Supplied as an authorized Bijur Delimon distributor.
Use the Request a Quote form below — it is already filled in with this part number. Add your quantity and required date and we will reply with price, lead time, and freight.
Key Specifications
- Series: M2500G
- Manifold Sections: 8
- System Type: Progressive lubrication
- Material: Steel (Zinc-Nickel Plated)
- Max Operating Pressure: 400 bar (5,800 psi)
- Discharge Volume Per Cycle: 0.005-0.080 cu. in. (0.08-1.31 cc)
- Lubricant Compatibility: SAE 10 Oil to NLGI #2 Grease
- Temperature Rating: Up to 350 deg F (163 deg C)
- Features: Modular design, corrosion resistant, Viton O-rings, easy maintenance
- Approx. Product Size: 5.0000 in W x 8.0000 in H x 6.0000 in D
Buying note: match the complete part number, manifold section count, lubricant type, pressure rating, and system monitoring requirements before ordering replacement divider valve components.
Product Documentation
Opens in your browser — use your browser's save option to download a copy.
Request a Quote
Get current price and lead time for M2500C8G.
Made to Order - Lead Time: 20-30 business days